
Gala Tower Construction Near Completion
FACILITIES
• Electric gate
• Lobby with reception
• Business center
• 2 elevators
• 2 power generators
• pool
• gym
• sauna
• upper bar (last level)
APARTMENTS
• Room – Dining
• Bathroom Visits
• 2 Bedrooms Each With A Bathroom.
• Kitchen
• Laundry
• Serv Bedroom, With Bathroom
• Covered Parking Spaces.
FINISHES
FLOORS AND WALLS
Italian porcelain flat or similar.
DOORS
Solid oak wood or similar.
Fire doors on stairs with anti panic bar, fire
resistant for 90 minutes.
GLASS ALUMINIUM JOINERY
Laminated glass anticyclonic 6mm + 3mm R + 6mm
clear, white lacquered. Specifically designed to
protect against sustained winds and high speed of a
hurricane.
KITCHENS
Modular Kitchens with doors and interior matt
laminate, glass doors, metal and tempered glass
cornice thickness 0.4 cm.
SERVICES
The building will have 2 Elevator mark Kone. Satin
Stainless steel at Front and back wall with a
capacity for 13 passengers.
SANITARY INSTALLATIONS
Tank with a capacity
Electrical heater.
Fire in all areas, with automatic sprinkler system in
accordance with the standards of NFPA.
Toilet and equipment American Standard
ELECTRICAL INSTALLATIONS
Fire detection.
Closed circuit TV.
Two power plants Caterpillar.
AIR CONDITIONING INSTALLATIONS
Individual VRF Equipment Apartment.